The Bridge the Ben Built

Over the summer Ben and his friend Andre had a little construction project.  They started working on a foot bridge that would enable walkers to complete the circuit around the parimeter of RFIS property (on the inside). 

The boys learned how to use a chainsaw (under supervision).

They built the bridge in the construction area at school.

Ben's bridge served as work space while it was under construction

They prepared the ground and the braces for the bridge to be installed.

And then they put the foot bridge over the little ditch so we don’t have to risk slipping and falling in the mud while walking from the door to the duplex and school!

Ben's foot bridge is done!
Print Friendly, PDF & Email

Report This Post