IMAG0974_BURST002 IMG_1899 IMG_1904 IMG_1931 IMG_1937 IMG_1948
First Covenant Sacramento Men came to keep going on the Family Restoration Center building, in Monteria. We even took them to the beach, since it was their sixth trip here. The second floor metal base is down, cement was poured over the first section (where Pastor Luis and Gladys live) and the church will finish the rest of the floor in December. Next steps — walls, Children’s ministry rooms, pastoral apartment, etc.
Print Friendly, PDF & Email

Report This Post

This entry was posted in Uncategorized. Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *